Floor Equipment connection process

Identify power/UPS needs. Consider power for Floor Equipment, plus the Controller PC.

Identify network needs. Convert network jack? Pull cable?

Attach to MfgNet – follow connection process. Scan for virus. IT join to domain

System Backups – how to perform? Cold clone of physical system drive? Image of system drive, plus new drive? Backups to tape? Fresh load from vendor?

Data Backups – how to perform? Backup software? File-based?

Document the process to return to operational state. Recovery process to replace a failed PC/drive? Recovery process to restore lost database or all folder/files? Recovery process to restore a single file? How to get vendor support? How to get parts? Are periodic maintenance tasks in our MicroMain PM system?
Generally speaking there is consensus that hyperplasia is needed and what steps prix viagra cialis should be taken. Ayurvedic Acharyas use ‘masha’ to treat male sexual cialis no prescription opacc.cv problems like erectile dysfunction, premature ejaculations and impotence. If all precautions are properly taken then one can easily able to get strong erection without any side effect. levitra samples http://www.opacc.cv/documentos/RegulamentodoControlodeQualidadedosAuditoresCertificados_15.12.2015.pdf However, while sourcing these generic medications it is important that you talk to your spouse of the difficulties that lies ahead. sildenafil tablets 100mg
Audit – someone else check the concepts.

Prove – verify the one-off backups are successful. If possible, verify a restore of data. If possible, verify a restore of system.

Automate – put the one-off backups onto a schedule. Schedule a PM or create a notifier to verify data and system backups are occurring. If possible, schedule a PM to verify restores of data and system annually.

Prove – verify the automated backups are successful and occurring on schedule. If possible, verify a restore of data. If possible, verify a restore of system.

Close – ensure processes to set up automation are documented and backed up if applicable.

This entry was posted in Business, Project Management, System/DB Administration. Bookmark the permalink.

Leave a Reply

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.